Two cleanup operations bundled (separate scopes, single commit
since they share the doc-tree settle):
1. Move ticket-NNNNNN-<slug>.md files into docs/tickets/. The
directory makes browsing the design log easier; the index
stays at docs/TICKETS.md (top-level pointer). Convention text
in TICKETS.md updated to spell the new path.
2. Delete three docs whose load-bearing content has either been
absorbed into the codebase or distilled into closed tickets:
- docs/naming-deferral.md (147 lines) — explained why we
don't rename claim_lattice → CTI/PROMETHEUS-Σ. Decision
stays in place; the rationale is no longer worth a
dedicated doc. Inline citations removed from
cti-architecture.md (4 refs), warrant.py, ticket-000003
(closed-ticket internal ref).
- docs/reference-frame-failure-class.md (169 lines) — Orwell
case journal that motivated the phrase-pattern retrieval
route. The route shipped; the analysis is now duplicate
with the closed Ticket #000002. Inline citation removed
from CLAUDE.md retrieval pipeline section + frame.py.
- docs/test-coverage-audit-2026-05-01.md (46 lines) —
point-in-time audit checking 16/16 of fox's §11 list. Tests
themselves live in tests/; the audit was a one-shot
checkmark exercise.
References updated:
CLAUDE.md, aborist/qa/frame.py, aborist/qa/retrieval_plan.py,
aborist/qa/warrant.py, docs/cti-architecture.md, docs/TICKETS.md,
docs/tickets/ticket-000003 + ticket-000004 (internal links).
Net: -362 lines + tickets/ subdir. 751/34 tests still pass.
3.1 KiB
3.1 KiB
Aborist tickets — index
Aborist uses a flat ticket-NNNNNN-<slug>.md convention for actionable
proposals: defects with a known root cause, design proposals awaiting
go/no-go, or scoped enhancements queued for future implementation.
Convention
- Filename:
docs/tickets/ticket-NNNNNN-<slug>.md. The ID is a six-digit zero-padded integer; the slug is hyphen-lowercase and short enough to stay readable on a 100-column terminal. - Numbering: monotonic, never reused. Pick the next free integer
greater than every existing ticket. The current next ID is on the
Next IDline below; bump it when you open a ticket and commit the bump in the same commit as the new ticket file. - Header: every ticket starts with
# Ticket #NNNNNN — <short title> **Status:** open · awaiting go/no-go (or "in progress", "closed") **Opened:** YYYY-MM-DD **Scope:** <one-liner — what this ticket is for> **Audience:** <who reads this> **Hard constraint:** <invariants this ticket commits to NOT break> - Body: problem statement, design choices with trade-offs,
recommendation, implementation sketch, scope boundaries, status.
See
ticket-000001-retrieval-keywords-audit-gap.mdfor a worked template. - Closure: when a ticket lands, flip Status to
closed · landed in commit <sha>and leave the file in place. Do not delete tickets; they are the design log.
Distinction from other docs
docs/ also contains architecture references and bench journey notes
that are NOT tickets — they describe state of the world rather than
proposing change. Examples that stay un-numbered:
cti-architecture.md(architecture reference)mesh.md,mesh-deploy.md(architecture + ops reference)qa-modes-bench-2026-04-30.md(point-in-time bench journal)verifier-semantic-gap-design.md,self-reference-design.md(older design docs that pre-date the ticket convention; leave as-is unless retroactively promoting one to a ticket adds value)concept-relations-design.md(architecture reference for the per-shardconcept_relationssynonym/rivalry layer + the 1.6% storage-tax rationale; landed 2026-05-01)
If a doc proposes change AND awaits a decision AND has scoped implementation cost, it's a ticket. Otherwise it's reference.
Index
Newest first. Update on every open/close.
| ID | Title | Status | Opened | Directive |
|---|---|---|---|---|
| #000005 | Label ladder migration (POINTER-LINKED → …) | closed · 2026-05-02 | 2026-05-01 | D7 |
| #000004 | Directive coverage in bench summary | closed · acd1f9c |
2026-05-01 | D8 |
| #000003 | Anchor-class warrant generalization (Module H+) | closed · 2026-05-02 | 2026-05-01 | D6 |
| #000002 | Reference-Frame Polarity Contract (Module L) | closed · 2026-05-02 | 2026-05-01 | D3 |
| #000001 | Retrieval-keywords audit gap | closed · 2026-05-02 | 2026-05-01 | D4 |
Next ID
000006