Updates §8 Status, §9.6 Phase details, §9.8 Test surface, §9.11
commit sequence to reflect actual implementation state:
§8 Status — Phase 0 through Phase 4 all landed 2026-05-03 across
six commits (2ffed00 → 5a60e85). 906 tests passing (120 new).
Defaults preserve §10.11.3 dry-run discipline:
quantifier_guard_apply_caps=False, reminder=False, reject=False.
Six-level disable hierarchy fully wired. Live verification recorded
for both reject-broad-fires (Winners of all major sports?) and
reject-broad-skips (name all members of the Beatles → bounded
universal, NOT rejected).
§9.6 Phase details — each phase tagged LANDED <sha>; description
trimmed to what actually shipped vs the original proposal.
§9.8 Test surface — every check box flipped to [x] with the
matching test file path and test count. The two reject-broad
integration tests remain skipped (exercised by live bench).
§9.11 Implementation commit sequence — actual SHAs replace planned
commit numbers. Notes that DAG/audit binding for quantifier_preflight
node ("commit 7" in plan) is NOT shipped — tracked as Phase 5
follow-up. Optional now; required for §9.5 Merkle-AGI-DAG framing
to fully hold.
Next steps are bench measurement, not code: full bench under dry-run,
classifier review, then flip apply_caps and measure §10.8 deltas.