Durable copy of /tmp/dav1dprometheus-arborist-update.md into
docs/ so it ships with the repo. Captures eight days of
substrate work landing on the 5S/5F/5T/5R framework:
- 21 sub-batteries × 662+ default fixtures
- 15 π* canonical-projection kernels (registry closed)
- canonical-projection persistence + multi-witness pipeline
- claim-pack corpus across 7 pillars (I-VII + IX), 92 records
- surface-ingest layer for cited textbooks (~351 docs, 1597
chunks across 6/7 g4 pillars)
- witness-sweep cron flowing (5/8 KERNEL-LLM-DIVERGED on live
Hermes; auto-extracted to 5F-Falsification fixtures)
- #000013 v7-W substrate paper closed
- #000016 ZK Phase-2 parked with bench-plan + wire-protocol
- #000018 soft-hash covert-channel analysis closed; three
follow-up tickets opened (#000034 / #000035 / #000036)
- 1,684 passing, 37 sympy-skipped
Same naming pattern as docs/qa-modes-bench-2026-04-30.md so
future point-in-time reports follow the precedent.
|
||
|---|---|---|
| .. | ||
| _source | ||
| diagrams | ||
| tickets | ||
| bench-maxing.md | ||
| benchmarks.md | ||
| cti-architecture.md | ||
| dav1dprometheus-update-2026-05-09.md | ||
| mesh.md | ||
| pi-star-composition.md | ||
| qa-modes-bench.md | ||
| seven-point-program.md | ||
| soft-hash-channel-analysis.md | ||
| spec-methodology.md | ||
| TICKETS.md | ||
| tool-action-dag-design.md | ||
| v7w-frontier-catalog.md | ||
| v8-fork-score.md | ||
| zk-frontier-bench.md | ||
| zk-wire-protocol.md | ||