arborist/docs
russell@unturf.com 8599ce3b2c
ticket #000036: add KAT-regen tooling + close
"One more iteration then close" (fox): added committed KAT-regeneration
scripts for both the T3 calculator and φ_PRG — the regen step was a
throwaway temp script before; now it's reproducible and the phi_prg
test's skipif reason ("run scripts/generate_phi_prg_kat.py") points at
a file that exists. Then closed #000036.

New scripts:
- scripts/generate_t3_bound_kat.py — regenerates
  bench/fixtures/t3-bound/known-answer-tests.jsonl from a fixed 12-config
  list (the §7 worked examples under max_envelope + non-default-C_B*
  + g=0 edge + explicit-b1_model pins for the other three models).
- scripts/generate_phi_prg_kat.py — regenerates
  bench/fixtures/phi-prg/known-answer-tests.jsonl from a fixed 10-entry
  list (placeholder/random seeds, one-bit-flip variants, block-boundary
  dim_h=16/17, 4096 counter-rollover stress).
- Both verified to reproduce the committed fixture data lines byte-
  for-byte (only the header comments changed, to reference the script).
  Each docstring states: run after any algorithm change, then bump the
  module version (CALCULATOR_VERSION / PHI_PRG_VERSION) so the fixture's
  version field changes too.

Doc/test:
- test_t3_bound_calculator.py skipif reason now references the regen
  script (matches the phi_prg test pattern).
- #000035 §3.3 + t3-bound.md §10.1 reference the regen scripts.

Closure (#000036):
- Status → closed · 2026-05-11 in the ticket file + TICKETS.md row.
  Phase 1 + dav1d Tier-1/Tier-2 (Option B in v1) + KAT-regen tooling
  all landed; all §5 acceptance criteria met; both dav1d closure
  blockers cleared. Continuation: empirical C_B1/C_B2/C_B3 tightening
  under #000043 (parks on v7 deployment data); landing the bound's
  framing into a v7 plastic-training spec parks on that spec gaining
  a deployment target; R2's architectural integrations (Merkle audit-
  event commitment, SQD canonicalization, CTI clause-lattice, 5F
  trigger, ForkScore security-risk) are separate tickets if wanted.
- t3-bound.md header flipped to "closed 2026-05-11".

Full suite: 2312 passed, 28 skipped.
2026-05-11 08:02:25 -04:00
..
_source #000012 Phase 1b: Merkle-AGI v8 consensus paper landed 2026-05-10 16:12:00 -04:00
diagrams docs/diagrams: rename aborist-modules → arborist-modules (post-rename cleanup) 2026-05-08 07:50:28 -04:00
tickets ticket #000036: add KAT-regen tooling + close 2026-05-11 08:02:25 -04:00
bench-maxing.md aborist/arborist 2026-05-07 09:31:49 -04:00
benchmarks.md aborist/arborist 2026-05-07 09:31:49 -04:00
calculator-test-patterns.md ticket #000036 Tier-2: dav1d Option B (conservative B1 envelope) applied in v1 2026-05-11 07:06:50 -04:00
cti-architecture.md aborist/arborist 2026-05-07 09:31:49 -04:00
mesh.md aborist/arborist 2026-05-07 09:31:49 -04:00
pi-star-composition.md pi_star: land ticket #000015 (π* domain library + composition algebra) 2026-05-07 16:51:33 -04:00
qa-modes-bench.md aborist/arborist 2026-05-07 09:31:49 -04:00
seven-point-program.md tests/doc_counts: regression test for numeric claims in docs/ (4x drift fix) 2026-05-10 16:15:52 -04:00
soft-hash-channel-analysis.md ticket #000035: flip φ_PRG counter big-endian → little-endian to match v7 TLV 2026-05-11 07:47:35 -04:00
soft-hash-channel-t3-bound.md ticket #000036: add KAT-regen tooling + close 2026-05-11 08:02:25 -04:00
spec-methodology.md docs: land ticket #000019 (spec methodology for π*, V, policy fields) 2026-05-07 16:53:28 -04:00
TICKETS.md ticket #000036: add KAT-regen tooling + close 2026-05-11 08:02:25 -04:00
tool-action-dag-design.md docs: add tool-action-dag-design.md research path (pre-ticket) 2026-05-07 19:47:50 -04:00
v7w-frontier-catalog.md #000013 closed: v7-W spatial-temporal substrate paper + namespace 2026-05-09 15:00:05 -04:00
v8-fork-score.md CLI: arborist v8 score → arborist substrate score 2026-05-10 09:12:34 -04:00
warrant-substrate-cookbook.md ticket #000035: flip φ_PRG counter big-endian → little-endian to match v7 TLV 2026-05-11 07:47:35 -04:00
zk-frontier-bench.md #000016 parked: ZK frontier-proof bench plan + wire protocol 2026-05-09 15:05:08 -04:00
zk-wire-protocol.md #000016 parked: ZK frontier-proof bench plan + wire protocol 2026-05-09 15:05:08 -04:00