Real-shard workload baseline + search latency: Phases 1/2/3 all landed 2026-05-09. Flip status from "in progress" to closed with Phase 3 commit reference. Authorship warrant ladder followup (CLI wiring) noted in ticket body as non-load-bearing — not blocking closure.
This commit is contained in:
parent
5c21e83b33
commit
0cb943561a
2 changed files with 2 additions and 2 deletions
|
|
@ -91,7 +91,7 @@ Newest first. Update on every open/close.
|
|||
| #000029 | Claim-pack source (axiom/theorem JSON bundles) | closed · landed 2026-05-09 | 2026-05-09 | — |
|
||||
| #000028 | Multi-modality witness for canonical shapes | closed · landed 2026-05-09 + follow-ups (capital ledger · sample rate) | 2026-05-08 | — |
|
||||
| #000027 | Canonical projections persist to providence_cache | closed · landed 2026-05-09 | 2026-05-08 | — |
|
||||
| #000026 | Real-shard workload baseline + search latency | in progress · Phase 1 + 2 + 3 landed 2026-05-09 | 2026-05-08 | — |
|
||||
| #000026 | Real-shard workload baseline + search latency | closed · Phase 1 + 2 + 3 landed 2026-05-09 (Phase 3 in `60b5748`) | 2026-05-08 | — |
|
||||
| #000025 | 5F battery (Function · Finetuning · Falsification · Formulate · Feedback Loop) | in progress · Phase 1a + 1b.2 + 1c + 1d landed 2026-05-09 | 2026-05-07 | — |
|
||||
| #000024 | 5T Phase 1b + Dav1DPrometheus vocabulary alignment | closed · landed 2026-05-08 | 2026-05-07 | — |
|
||||
| #000023 | 5S Phase 1b: Syllogism · Synthesis · Semiotics | closed · landed 2026-05-08 | 2026-05-07 | — |
|
||||
|
|
|
|||
|
|
@ -1,6 +1,6 @@
|
|||
# Ticket #000026 — Real-shard workload baseline + search latency
|
||||
|
||||
**Status:** in progress · Phase 1 + 2 + 3 landed 2026-05-09
|
||||
**Status:** closed · Phase 1 + 2 + 3 landed 2026-05-09 (Phase 3 in `60b5748`)
|
||||
**Opened:** 2026-05-08
|
||||
**Scope:** establish a reproducible baseline for arborist's behavior
|
||||
on real shards (~38 GB Wikipedia + crawl). Capture latency, capital
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue